Thursday, April 26, 2007

Wow, these guys work FAST!

Wednesday, a crane loaded a steel beam to the roof top (I just missed it with my camera, but here is the crane at least!). You can see the beam set back on top of the exposed garage roof.

Thursday, the floor joists are finished and insulation is almost done (see photos from the top view). Our framer works such long hours, I asked if he sleeps in his truck in our driveway. ;-)
Foundation forms are built and ready to go. Friday, the foundation should be poured.
It's been beautiful weather, though we prayed for rain - the concrete crew could work on our job in the rain, but not the other jobs for this week. Oh well, things seem to be moving along at a great pace!

No comments: